A pile load test that loads the pile against itself using an embedded jack, with no surface reaction system.

Overview

A hydraulic jack cell is placed within the pile; it pushes the upper shaft up and the lower shaft and base down so the two portions react against each other. High capacities can be tested without reaction piles or kentledge.

A bi-directional test places a sacrificial jack (load cell) inside the pile and pushes the shaft up and the base down against each other. The pile provides its own reaction, so very large loads can be tested without heavy frames or kentledge at the surface.

  • Embedded jack cell within the pile
  • Separates shaft and base resistance
  • No surface reaction frame required
  • Suited to high-capacity and hard-to-access piles

Key Benefits

Very high loads

Capacity in the hundreds of tonnes is achievable without a large surface reaction system.

Works where access is limited

Suited to river, marine, congested and elevated sites.

Separate shaft and base curves

Each resistance is measured directly.

Safer, tidier site

Less heavy plant and kentledge to handle.

Where It Is Used

  • River and marine piles
  • Very high-capacity bored piles
  • Constricted urban sites
  • Piles that are hard to reach from the surface

How We Work

  1. 1

    Position the jack

    Locate the load cell at the level that balances shaft and base resistance.

  2. 2

    Cast into the pile

    Install the assembly with the reinforcement cage and concrete the pile.

  3. 3

    Pressurise the cell

    Pump in stages, recording upward and downward movement.

  4. 4

    Construct the equivalent curve

    Combine results into an equivalent pile-head load-settlement curve.

What You Receive

  • Upward and downward load-movement curves
  • Equivalent top-loaded curve
  • Shaft and base capacity values
  • Test report

Frequently Asked Questions

Is the jack recovered?

The cell stays in the pile and is normally grouted after the test.

Can it be used on any pile?

It must be planned before the pile is constructed, since the cell is cast into it.